Notice: Function _load_textdomain_just_in_time was called incorrectly. Translation loading for the rocket domain was triggered too early. This is usually an indicator for some code in the plugin or theme running too early. Translations should be loaded at the init action or later. Please see Debugging in WordPress for more information. (This message was added in version 6.7.0.) in /home/g8fm8och2ng1/public_html/wp-includes/functions.php on line 6114
GSD Construction | LBC Tank Terminals

LBC Tank Terminals

Location: Seabrook-Bayport Industrial Complex
Square Footage: 3,200 SQ FT
Designer: Method Architecture

This 3,200 SQ FT project in the Seabrook-Bayport Industrial Complex features plenty of storage, office, and staff spaces. The office areas are side-by-side in open rooms, allowing for maximum collaboration between team members. The staff spaces, including kitchen and bathroom areas, provide everything a staff member could need to feel comfortable at work.

 

We enjoyed working with Method Architecture on this project!